OASIS DITA Machine Industry Subcommittee Wiki
The DITA TC Wiki serves the OASIS DITA TC for collaborative design work and for management of comment responses and other tracking documents.
For your consideration at the TC meeting on Tuesday, September 5th, 2006, I
propose that the TC officially establish a "DITA for machine industry" subcommittee. The attachment below provides the proposal name, goals, deliverables, chair, and initial membership for this proposed subcommittee.
Thank you for your consideration and support.
Chris Kravogel SeicoDyne GmbH phone: +41 41 534 66 97 christian.kravogel@seicodyne.com
Subcommittee name "DITA for the machine industry SC" (maybe someone comes up with a better name)
Working overview table of the main areas of work of the SC
Pos.
Product Lifecycle Stage
Main Information
Referenced Information
Main Document
Referenced Document
Lead
0
Product Planning
- Regulatory Compliance
- Part Availability
- Options List-
- User Requirements Document
- Product Planning Document-
Several
1
Development
- Risk Management
- Technical Data
-- Wiring Diagram
-- Pneumatics/Hydraulics Plan
-- Product Specifications
-- Exploded View
-- etc.
- Materials List
- Tools List
- Warning and Hazard Information
- Hazardous Waste Handling Instructions- Prod. Lifecycle Plan
- Engineering Change Notices
- Material Safety Data Sheet
- Technical SpecificationJang
2
Sales
- Materials List
- Exploded View
- Options List- Product Catalog
- Data Sheet- Modernization Instruction
Sissi
3
Customization
- Compatibility Matrix
- Warning and Hazard Information
- Materials List
- Tools List
- Product Specifications
- Exploded View
- Part Availability
- Hazardous Waste Handling Instructions
- Technical Data
- Regulatory Compliance- Configuration Information
- Planning Documentation- Material Safety Data Sheet
Tim
4
Production
- Production Plan
- Warning and Hazard Information
- Materials List
- Tools List
- Product Specifications
- Exploded View
- Part Availability
- Hazardous Waste Handling Instructions
- Technical Data
- Regulatory Compliance- Manufacturing Instruction
- As-Built Specification- Material Safety Data Sheet
Tim
5
Training
- Technical Data
- Task Analysis
- Lesson Level Outline
- Lecture slides
- Assessments
- Student Guide
- Instructor Guide
- Work Book
- SCORM
- Ancillary- Functional Component Instruction
Robin
6
Storage
- Warning and Hazard Information
- Materials List
- Tools List
- Material Safety Data Sheets
- Regulatory Compliance
- Hazardous Waste Handling Instructions
- Periodic Service Maintenance Schedule- Storage Manual
- Storage Instruction
- Transport InstructionTim
7
Installation
- Warning and Hazard Information
- Materials List
- Tools List
- Product Specifications
- Exploded View
- Part Availability
- Hazardous Waste Handling Instructions
- Technical Data
- Compatibility Matrix
- Regulatory Compliance- Installation Manual
- Installation Instruction
- Storage Instruction
- Transport Instruction
- Modernization Instruction
- Diagnostics / Troubleshooting Manual
- Material Safety Data SheetsTim
8
Commissioning
- Commissioning Instruction
- Test plan
- Test protocols- Commissioning Manual
- Modernization Instruction
- Diagnostics / Troubleshooting Manual
- Material Safety Data Sheet
- Storage InstructionJonathan
9
Operation
- Technical Data
- Operation Manual
- Functional Component Instruction- Operation Instruction
- Installation Instruction
- Servcie Bulletin / Notes
- Material Data SheetChris
10
Warranty
- Diagnostics / Trouble Codes
- Service Bulletin / Notes
Robin
11
Maintenance
- Maintenance Plan
- Periodic Service Maintenance Schedule
- What to do information
- How to do information
- When to do information- Removal Procedure
- Technical Data
- Diagnostics / Trouble Codes
- Exchange Procedure
- Restoration/repair Procedure
- Hazardous Waste Handling Instructions- Maintenance Manual
- Spare Parts Manual
- Service Bulletin / Notes
- Maintanance Card- Maintenance Instruction
- Installation Instruction
- Functional Component InstructionJonathan
12
Diagnostics / Troubleshooting
- Diagnostics / Trouble Codes
- Technical Data
- Diagnostics / Troubleshooting Manual
- Diagnostics / Troubleshooting Instruction
- Material Data SheetRobin
13
Modernization Upgrade / Update
- Removal Procedure
- Technical Data- Modernization Manual
- Change Pages- Modernization Instruction
- Installation Instruction
- Phase Out Instruction
- Material Data Sheet
- Service Bulletin / NotesChris
14
Phase Out
- Recycle Information
- Wast Disposal
- Phase Out Instruction
- Decommissioning Instruction- Hazardous Waste Handling Instructions
- Material Data Sheet
- Tools List- Phase Out Manual
Chris
Publication Defintions [robin]
- Operation Manual: product operating information
- Maintenance Manual: operation and care information
- Service Manual: service and repair information
- Parts Catalog: illustrations and parts list for servicable repair parts
- Service Bulletins: updates to information in the service manual
- Service Bulletin Manual
- Recall Bulletins: service work or parts replacement in connection with a recall notice
- Field Service Modifications: non-safety related service work
Initial Information to DITA Machine Industry Subcommittee Wiki
Goals The subcommittee has the following statement of initial goals:
- Develop a design for structured, intent-based authoring of content tailored to the needs in the machine industry:
- domains for specific areas of content (e.g. hazard statements - see also proposal #5)
- if necessary specific topics (e.g. special task types for preventive, corrective, predictive and condition based maintenance)
- tbd.
- Establish guidelines that promote best practices for applying standard DITA approaches to the needs in the machine industry:
- language reference / user guide
- powerpoint presentations
- training material.
Proposed chair Christian Kravogel, SeicoDyne GmbH (though open to other nominations or co-chair)
Deliverables Proposed initial work products for the subcommittee include the following:
- Task 1: Brainstorming: ideas and proposal collection.
- Task 2: Developing a top-level plan for topics and domains.
- Task 3: Design approval
- Task 4: Developing DITA DTDs schemas and processing, and piloting and validating the top-level designs against sample content.
- Task 5: Embedding the sample DTDs, schemas and sample documents to the DITA-OT demo section for field tests and feedbacks.
- Task 6: Reviewing the reports. Discussion in the TC, with recommended next steps (e.g. full or part integration into the DITA standard.)
Initial membership The following TC members have already contributed content for proposal #5 hazard statements and might be interested in joining the SC.
The following external person indicated interest to contribute ideas as invited expert to that SC:
- Prof. Sissi Closs, Comet Communications GmbH (OASIS Member)
Home pages for the OASIS DITA TC and this subcommittee
Member pages for the OASIS DITA TC and this subcommittee
Wiki home page for the OASIS DITA TC
Dita Wiki